SAP MRP - Materials Requirements Planning Hints and
Tips
Please refer to the new site :-
http://www.sap-basis-abap.com/sappp01.htm
The main function of SAP Material Requirements Planning is to guarantee
material availability, it is used to procure or produce the requirement
quantities on time both for internal purposes and for sales and distribution.
This process involves the monitoring of stocks and, in particular, the
automatic creation of procurement proposals for purchasing and production.
Table of Contents
MRP
Difference between MRP type manual reorder point
and automatic reorder
Main difference between the MRP type PD and MPS
type M0
Storage Location included/excluded from MRP
Planned Independant Requirement included/excluded in MRP run
Excluding/Including Safety Stock on Stock Requirements List
MD02 - Run MRP Single item Multi level
Batch Input for MD02
Shortage/Surplus of material stock level due to differences in Planned/Production
Order Start and Finish date
Subcontracting upgrade 3.0/3.1 to 4.x
Quota Arrangement for Multi Plant Purhasing
Planning Strategy
Number Range by Plants during MRP Run
Mass change MRP indicator
Connecting the planning calendar to your lot size key
MRP, timing of purchase requests
SAP SOP
Sales, Operation and Planning (Info Structure S076)
|